Where is cfb borden located




















Borden continued to be used as a flight centre until the onset of the jet age, when the only training to be conducted here, with respect to the Air Force, was that of air maintenance crews. In , Borden became an integrated training base and the following schools were formed:. In , the armour and infantry schools moved to Gagetown and the Language Training School was formed. The move was made to centralize headquarters staff functions.

At a time when most government departments are being asked to do more with less, the Canadian Forces and CFB Borden are no exception. May 20, May 14, The Military Spouse Employment Initiative provides military spouses and common-law partners with tools and resources to develop their skills and pursue their careers within the federal Public Service. May 11, Phone: extension Email: PA forces.

Read about the history of 16 Wing Borden. Architectural Value Building S is valued for its classical modern design and its simple, functional plan. It is constructed to a standard plan for a bed barrack, which was based on prototypes constructed during WWII.

It is a stucco-clad, concrete building, with a flat roof set behind a low parapet wall. The primary elevation is a symmetrical composition centered on a double-height, flat-topped portico of six rectangular pillars placed between end walls, the whole projecting from the front wall and above the original roof line to protect a principal entrance.

The elevations comprise two storeys of horizontal window openings on continuous lintels, accented by continuous horizontal box-profile mouldings that wrap around the building, except at the recessed northeast and southeast corners, which are set back in plan with a double-height frame that folds around the two corner windows on each floor. The original multi-paned windows have been replaced by slightly varying single-pane units.

In plan, the building forms an elongated U, with a central single-storey pavilion on the half-court side, and stair blocks at its ends, their flat roofs aligning to the upper mouldings of the elevations. Environmental Value Backing onto a small ravine at the western edge of the main settled portion of CFB Borden, Building S is situated in front of a large manicured lawn, with paved areas at the front entrance and most of the rear half-court.

The building reinforces the formally planned character of the setting and is a familiar building at the base.



0コメント

  • 1000 / 1000